{"id":15845,"date":"2024-08-06T09:58:14","date_gmt":"2024-08-06T07:58:14","guid":{"rendered":"https:\/\/www.bitou.net\/?post_type=product&p=15845"},"modified":"2026-07-27T09:00:42","modified_gmt":"2026-07-27T07:00:42","slug":"wind-park","status":"publish","type":"team_event","link":"https:\/\/www.bitou.de\/en\/team-building\/wind-park\/","title":{"rendered":"Wind park – innovative & cooperative"},"content":{"rendered":"\n
\n\t
\n\t\t\n\t\t

Event Schedule \u2013 How Teams Generate Real Energy<\/h2>\n\t\n\t<\/div>\n<\/section>\n\n\n
\t\n\t
\n\t\t\n\t\t
\n\t\t\t
\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
<\/svg>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>

Arriving & Developing a Vision \u2013 From Wonder to Mission <\/h3>

The participants enter the venue and see numbered tables, closed boxes and a large selection of materials. It is not yet clear how this is all to be turned into a functioning wind farm \u2013 and that is precisely what creates the excitement.
\nAfter a brief, energising introduction, the task becomes clear:
\nEach team builds its own wind turbine. But the real goal is bigger \u2013 it\u2019s about the combined energy yield of the entire wind park.
\nCuriosity turns into focus. Individuals become a project team.<\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t

\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
<\/svg>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>

Construction phase \u2013 When roles are defined and momentum builds <\/h3>

At first, the task seems complex. But after a few minutes, things start to take shape. Teams plan, build, discuss and test.
\nSome take charge of the construction, whilst others handle strategy, the budget or communication. Strengths, roles and initial coordination structures emerge quite naturally.
\nThe collaboration doesn\u2019t stop at their own table \u2013 because a wind farm only works if the teams coordinate with one another.
\nHere, project-based thinking isn\u2019t explained, but experienced.<\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t

\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
<\/svg>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>

Security review & strategic direction \u2013 collaboration is key <\/h3>

Before the wind park goes into operation, every wind turbine is inspected. Stability and safety are crucial, as real forces come into play once the turbines are up and running.
\nThen comes the strategic moment:
\nHow do we position our wind turbines so that they do not block each other\u2019s wind?
\nNow it is no longer about individual teams, but about the interaction between all those involved. Communication across team boundaries becomes the key to maximising output.<\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t

\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
<\/svg>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>

Finale & Measurement \u2013 The moment that brings everything into focus <\/h3>

The rotors begin to turn. The voltage readings rise \u2013 8\u2026 12\u2026 17\u2026
\nThere\u2019s a buzz in the air. Everyone\u2019s eyes are fixed on the display. With every higher reading, their pride grows.
\nIn the end, there\u2019s a shared figure. And this figure is more than just a number: it\u2019s made tangible \u2013 for example, by comparing what could be powered by this energy.
\nThe homemade wind turbine stands almost two metres tall in front of the team. Visible. Measurable. Achieved.
\nA moment that shows: when we pool our strengths, real energy is created.<\/p>\n<\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t<\/div>\n<\/section>\n\n\n

\n\t
\"Windpark<\/picture><\/div>
\"Windpark<\/picture><\/div>
\"Windpark<\/picture><\/div>
\"Windpark<\/picture><\/div>
\"Windpark<\/picture><\/div>
\"Windpark<\/picture><\/div>
\"Windpark<\/picture><\/div><\/div>\n<\/section>\n\n\n
\n\t
\n\t\t

Your team trip to the wind park<\/h2>\n

The wind park is the ideal location for setting up:<\/p>\n